Scope of work
Furnish all labor, equipment and materials for the deep foundation and substructure concrete package on the Phase II south approach.
- Thirty-two 6-foot diameter drilled shafts to depths of 95 feet
- Twelve cast-in-place pile caps with mass concrete thermal control plans
- Seismic pier encasements and shear key retrofits on piers 14 through 19
- In-water work windows coordinated with the regional fisheries permit