Scope of work
Design-assist and installation of the complete HVAC and climate control system for the Apex Tech Tower office floors and podium amenity levels.
- Central chilled water plant with two 1,200-ton magnetic bearing chillers and thermal energy storage
- Variable air volume distribution and dedicated outdoor air systems for 24 floors
- Building automation system integration with the owner's smart building platform
- Testing, adjusting and balancing, commissioning support and LEED Gold documentation