Skip to content
24/7 Emergency Response(888) 555-0124

RFP-2026-09

Open for Bidding

Commercial HVAC & Climate Control Integration

Design-assist mechanical package covering the central chilled water plant, VAV distribution, dedicated outdoor air systems and building automation for 24 office floors.

Trade
Mechanical & HVAC
Project
Apex Tech Tower
Submission deadline
December 1, 2026

Scope of work

Design-assist and installation of the complete HVAC and climate control system for the Apex Tech Tower office floors and podium amenity levels.

  • Central chilled water plant with two 1,200-ton magnetic bearing chillers and thermal energy storage
  • Variable air volume distribution and dedicated outdoor air systems for 24 floors
  • Building automation system integration with the owner's smart building platform
  • Testing, adjusting and balancing, commissioning support and LEED Gold documentation

Submission requirements

  • Licensed Texas mechanical contractor with in-house design-assist engineering
  • Three completed commercial projects over 300,000 sq ft in the last five years
  • 100% performance and payment bonds
  • Bid form, schedule of values, preliminary equipment selections and a manpower loading curve
Back to all tenders
Made with Modulify