Scope of work
Vanguard is soliciting lump-sum bids from qualified steel fabricators and erectors to furnish, detail and erect structural steel for the Apex Tech Tower in Austin, Texas.
- Approximately 2,400 tons of wide-flange, HSS and plate girder framing for the podium transfer levels
- Rooftop mechanical screen framing, davit supports and dunnage for cooling towers
- Level 3 pedestrian skybridge with a 118-foot clear span
- Embeds, anchor rods and connection design for all moment and braced frames
- Shop drawings, erection drawings and a BIM model coordinated to LOD 400
Work is sequenced around an active tower crane and a continuous concrete core pour cycle. Steel erection is scheduled to begin in February 2027.